Prepping the Chassis


chassis2

We started the chassis prep at 12:50 - leaving no real time for lunch.

chassis1

First step is to disconnect the driving train.

chassis3

We then worked on the re-position of the engine.

chassis4

chassis5
The gas tank has to be remounted with special new bars across the rear.

chassis6

The engine is lifted and moved back about 32 inches.

chassis7

chassis8

chassis9

chassis10

New transmission mounts were welded to the sides about 32 inches back from its original position.

chassis11

chassis12

chassis13

gas tank mounting

The engine is repositioned with a new engine cross-member made from the old transmission cross-member.

chassisfinish

Around 5:30 p.m. all welding is finally done and the frame was taken off for some serious pressure cleaning.

day1finished

End of Day One.